THE FLOWER MOUND BRIEF
THU · SEP 17 · 202697°F· SunnyAQI —
The Flower Mound Bee
The hundred town documents, read for you. The one that matters, sent to you.
Town Hall

eTRAKiT Is Offline Through Monday — Plan Around It Before Tuesday

The town's permit and inspection portal goes dark today for maintenance, and a Monday inspection means a delayed Monday inspection.

2026-09-172 MIN READ#eTRAKiT · #permits · #building inspections · #Development Services · #system maintenance · #contractors · #homeowners
Flower Mound Town Hall exterior on Cross Timbers Road, home to Development Services and Building Inspections
Photo: The Flower Mound Bee Social Team

If you had plans to pull a permit or schedule a building inspection online this weekend, change those plans now. The Town of Flower Mound's eTRAKiT portal — where contractors submit permits, request inspections, and track project status — is down for maintenance starting Thursday, September 17, and won't be back until Tuesday.

That's the whole weekend plus Monday.

eTRAKiT is the system that ties together every stage of the permitting process — from a first application to final sign-off — which means any active construction project in town is affected, whether that's a new backyard deck or a commercial build-out on Cross Timbers. Inspections can be requested as late as 7:30 a.m. for a same-day slot and scheduled up to 14 days in advance — none of which works while the portal is down.

For contractors, the math is simple. Any inspection that was going to be booked for Monday through the portal can't be booked through the portal. Inspector office hours run 7:30–8:30 a.m. and 3:30–4:30 p.m. each day, so calling in when the system returns Tuesday is the next option. Building Inspections is at 972.874.6355.

Homeowners waiting on a contractor to pull a permit or confirm an inspection date are in the same position. If your contractor is pulling the permit for you, you'd normally check where things stand at etrakit.flowermound.gov — and that lookup is offline too.

The outage window runs Thursday through Monday, covering a weekend and the following day. If your project timeline is tight, that window matters.

The short version: eTRAKiT comes back Tuesday. If you have a time-sensitive permit or inspection riding on this weekend, call Development Services directly rather than waiting for the portal. Planning staff can be reached at 972.874.6350 or planning@flowermound.gov. Building Inspections is at 972.874.6355. Tuesday morning will be busy — call before then if you can.

Sources
  1. eTRAKiT System Maintenance Notice — Town of Flower Mound Civic Alert
  2. Building Inspections — Town of Flower Mound
  3. Homeowner Resources — Town of Flower Mound
  4. Applications / Checklists (eTRAKiT) — Town of Flower Mound
  5. Building FAQs — Town of Flower Mound
  6. Foundation Info Sheet (Inspection Scheduling) — Town of Flower Mound
  7. Flower Mound, TX - Official Website | Official Website
  8. INSTRUCTIONS TO LOGIN Step 1: Please go to http://etrakit.flowermound.gov/
  9. Code Enforcement | Flower Mound, TX - Official Website
  10. News Flash • Flower Mound, TX • CivicEngage
  11. Pick-Up Window, Outdoor Book Drop Unavailable May 6-11
  12. News Flash • Flower Mound, TX • CivicEngage
ShareXFacebookEmail
← back to the front page